Three things drive any sensible purchase — you need it, its quality holds up, and service stands behind it — and the C_TS422_2021 Deutsch practice materials at PassSureExam answer all three with 82 practice questions for the C_TS422_2021 Deutsch exam, verified answers, and care that continues long after checkout.
SAP C_TS422_2021 Deutsch Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 |
| Exam Number: | C_TS422_2021 Deutsch |
| Certificate Validity Period: | Certification remains valid until SAP retires this version |
| Exam Price: | USD ~541 (may vary by location) |
| Passing Score: | 54% to 65% (varies by version) |
| Real Exam Qty: | 80 |
| Available Languages: | Japanese, English, German, Chinese |
| Exam Duration: | 180 minutes |
| Related Certifications: | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (2022) SAP Certified Application Associate - SAP S/4HANA Supply Chain |
| Exam Format: | Multiple Choice, Multiple Response |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored via SAP Certification Hub or onsite at authorized test centers. |
| Pre Condition: | No formal prerequisite, but practical experience in SAP S/4HANA Production Planning and Manufacturing is strongly recommended. |
| Official Syllabus URL: | https://learning.sap.com/certifications/sap-certified-associate-sap-s-4hana-production-planning-and-manufacturing |
SAP C_TS422_2021 Deutsch Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Capacity and Demand Planning | 8% - 12% | - Capacity and Demand Concepts
|
| Lean Manufacturing and Repetitive Processes | 8% - 12% | - Lean Manufacturing Principles
|
| Advanced Planning in SAP S/4HANA | 12% - 15% | - Planning Concepts and Tools
|
| Material Requirements Planning (MRP) | 8% - 12% | - MRP Fundamentals
|
| Master Data for Production Planning | 12% - 18% | - Master Data Management
|
| SAP S/4HANA Supply Chain Integration | < 10% | - Integration Overview
|
| Production Orders and Order Management | 12% - 18% | - Production Order Configuration
|
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 (C_TS422_2021 Deutsch Version) Questions Answered by PassSureExam
- SAP S/4HANA Supply Chain Integration (< 10%)
- Master Data for Production Planning (12% - 18%)
- Material Requirements Planning (MRP) (8% - 12%)
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 (C_TS422_2021 Deutsch Version) Sample Questions:
Wie erreichen Sie bei Kapazitätsengpässen einen realisierbaren Produktionsplan?
- A. Ausführen eines unendlichen Produktionsplanungslaufs
- B. Stellen Sie die verfügbare Kapazität ein.
- C. Planungsfenster verkleinern
- D. Optimale Reihenfolge bilden, um Rüstzeiten zu reduzieren
- E. Wählen Sie einen alternativen Modus für eine Ressource aus.
Correct Answer: B,D,E 🗳️
Wo pflegen Sie den Arbeitsplatz, der die Fertigungslinie für die Serienfertigung darstellt?
- A. Serienfertigungsprofil
- B. Produktionsversion
- C. Produktionskostensammler
- D. Routing
Correct Answer: B,D 🗳️
Sie möchten aus einem Planauftrag einen Fertigungsauftrag erstellen. Welche Methoden könnten Sie anwenden?
- A. Teilumwandlung
- B. Sammelumwandlung
- C. Kombinierte Umwandlung
- D. Auftragsfreigabe
Correct Answer: A,B 🗳️
Welche der folgenden Konfigurationsschritte sind beim Einrichten des Alert-Monitors in Advance Planning möglich?
- A. Gesamtprofil dem Berechtigungsprofil zuordnen.
- B. Alarmprofil dem Gesamtprofil zuordnen.
- C. Objektselektionsvariante für transportbeziehungsbezogene Alerts anlegen.
- D. Objektselektionsvariante für produktbezogene Alerts anlegen.
Correct Answer: B,D 🗳️
Die Modusauswahl ist eine der Planungsoptionen, die in Advanced Planning in SAP S/4HANA verfügbar sind. Wann können Sie die Modusauswahl verwenden?
- A. Wenn mehrere Produktionsversionen für ein Produkt gepflegt werden
- B. Wenn innerhalb einer Operation alternative Ressourcen verwendet werden
- C. Wenn mehrere Vorgänge für ein Produkt gepflegt werden
- D. Wenn mehrere Planaufträge auf einer Ressource existieren
Correct Answer: B 🗳️