Quality is a word every site uses, but for the BICSI Registered Communications Distribution Designer question bank at PassSureExam it has a concrete meaning — 358+ Q&As covering the BICSI Registered Communications Distribution Designer objectives, every answer verified, and a regular feedback loop that keeps the material honest.
BICSI RCDD Exam Overview:
| Certification Vendor: | BICSI |
|---|---|
| Exam Name: | Registered Communications Distribution Designer Certification Exam |
| Exam Number: | RCDD v15 |
| Available Languages: | English |
| Related Certifications: | OSP® Outside Plant Specialist DCDC® Data Center Design Consultant RTPM® Registered Telecommunications Project Manager |
| Real Exam Qty: | 100 |
| Exam Price: | $510 (BICSI Member) / $725 (Non-Member) |
| Passing Score: | 70% |
| Certificate Validity Period: | 3 years |
| Exam Format: | Enhanced Matching, Multiple Response, Scenario-Based Items, Multiple Choice |
| Exam Duration: | 150 minutes |
| Recommended Training: | BICSI RCDD Exam Prep Course BICSI TDMM 15th Edition |
| Exam Registration: | BICSI Official RCDD Page Pearson VUE Scheduling |
| Sample Questions: | ![]() |
| Exam Way: | Computer-based proctored exam; available at Pearson VUE test centers or online proctored |
| Pre Condition: | Option 1: 2 years ICT design experience + current BICSI certification (TECH, RTPM, DCDC, OSP); Option 2: 2 years ICT design experience + 2 years higher education in ICT; Option 3: 5 years verifiable ICT experience |
| Official Syllabus URL: | https://www.bicsi.org/education-certification/certification/rcdd |
BICSI RCDD Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| ICT Solutions Design | 66% | - Backbone and horizontal distribution design - Data center and special systems design - Grounding and bonding systems - Telecommunications pathways and spaces - Copper and optical fiber cabling systems - Outside plant infrastructure - Wireless and AV systems integration |
| Installation Process Support | 15% | - Commissioning and documentation - Construction coordination - Firestop and separation systems - Field testing and verification |
| Project Scope Definition | 10% | - Code, standard, and regulatory compliance - Client requirements and objectives - Design deliverables and specifications - Site survey and existing conditions assessment |
| Bid/Tender Process Support | 9% | - Contract and specification review - RFP/RFQ response and evaluation - Vendor and contractor assessment - Bill of materials and quantity takeoffs |
What to Know About RCDD Before You Start
- Project Scope Definition (10%)
- Installation Process Support (15%)
- ICT Solutions Design (66%)
BICSI Registered Communications Distribution Designer Sample Questions:
When allocating termination space for CAT 6 and optical fiber cables, it is recommended that additional space of up to ________ percent be considered for the routing of the cables and patch cords.
- A. Five
- B. Thirty
- C. Ten
- D. Twenty
Correct Answer: D 🗳️
Rack mounted hardware is installed in two standard sized racks or cabinets. Those sizes are:
- A. 482 mm (19 in) and 1020 mm (40 in)
- B. 610 mm (24 in) and 762 mm (30 in)
- C. 482 mm (19 in) and 584 mm (23 in)
- D. 762 mm (30 in) and 914 mm (36 in)
- E. 482 mm (19 in) and 762 mm (30 in)
Correct Answer: C 🗳️
The distance a CCTV signal may be run is determined by the strength of the signal at the source, required signal strength at the receiver, and:
- A. Recorded image
- B. Signal loss of the cable
- C. Video format
- D. Power requirement of the receiving device
Correct Answer: B 🗳️
A 24 port layer 2 switch can perform all of the following functions EXCEPT:
- A. Route
- B. Bridge
- C. Link aggregation
- D. Full duplex operation
Correct Answer: A 🗳️
What type of facility requires a building automation system (BAS) device to be located every 5 sq m (50 sq ft)?
- A. Hospital
- B. Mechanical room
- C. Education classroom
- D. Factory
- E. Hotel guest room
Correct Answer: B 🗳️



