
Use the best ways of preparing for E-S4HCON2023 Exam Dumps with PassSureExam SAP E-S4HCON2023 dump PDF [2024]
SAP E-S4HCON2023 exam candidates will surely pass the Exam if they consider the E-S4HCON2023 dumps learning material presented by PassSureExam.
NEW QUESTION # 41
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Shadow repository creation (EU_IMPORT*)
- B. Uptime migration (EU_CLONE_MIG_UT_RUN)
- C. Downtime migration (EU_CLONE_MIG_DT_RUN)
- D. ParaUel distribution (PARDIST_SHD)
Answer: B
NEW QUESTION # 42
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Apply the recommendations of the simplification list
- B. Check the compatibility of custom code with SAP S/4HANA
- C. Perform the migration of data into the new data structure
- D. Run the database migration to the SAP HANA database
Answer: A,B
NEW QUESTION # 43
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION # 44
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It contains a section "free space requirements"
- B. It is target release specific
- C. It contains a troubleshooting section
- D. It is a database-specific document
Answer: A,B
NEW QUESTION # 45
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
- A. Using R3load and network socket connection
- B. Using R3load and file transfer
- C. Using R3load and memory pipes
- D. Using work processes and network socket connection
Answer: C
NEW QUESTION # 46
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the messages shown by the SUM UI
- B. Check the most recent entries in SAPup.log
- C. Check the system log (transaction SM21) of the SAP system
- D. Check the most recent entries shown in file sapevt.trc
Answer: A,B
NEW QUESTION # 47
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question
- A. You can verify that the content of the download directory matches the stack XML file.
- B. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs
- C. You can find the optimal number of parallel H3load processes by monitoring host performance
- D. You can record the modification adjustment during migration and use the transports in the next runs.
Answer: B,C
NEW QUESTION # 48
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. An SAP S/4HANA conversion is performed, without adapting the customer data.
- B. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
- C. An upgrade of the software components is performed, without changing the database type.
- D. A change of the database type is performed, without changing the software components.
Answer: D
NEW QUESTION # 49
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Import a transport request from the development system that contains the recording of the activation.
- B. During conversion, SUM delivers some business functions already activated.
- C. Activate the required business functions manually in the production system.
- D. Specify the business functions that need to be switched on during the prepare part of SUM.
Answer: A,B
NEW QUESTION # 50
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:
- A. Check for running R31oad processes on the host of the primary application server
- B. Check for running batch jobs in the shadow system via Job Overview (SM37)
- C. Check for running R3trans processes on the host of the primary application server
- D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
Answer: C,D
NEW QUESTION # 51
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- C. You need to build up a SI check framework by applying SAP notes.
- D. Depending on the SAP S/4HANA version, there are different SI check frameworks.
Answer: C,D
NEW QUESTION # 52
In ICNV. How database operations synchronized between the source and the target table?
- A. AA
- B. Deletes are directly executed in the target table by delete trigger.
Answer: B
NEW QUESTION # 53
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. An additional temporary database is used during uptime
- B. The repository is migrated in uptime
- C. TABIMJJPG is executed in uptime
- D. Dedicated application tables are migrated in uptime
Answer: D
NEW QUESTION # 54
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
- A. Generate it by analyzing the specific custom code via RFC
- B. Download it from SAP Support Portal
- C. Apply the corresponding SAP note via SAP Note Assistant
- D. Configure it within transaction ATC
Answer: B
NEW QUESTION # 55
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. During downtime
- B. During uptime
- C. During SPDD
- D. Post-downtime
Answer: B,D
NEW QUESTION # 56
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path was stored in file sumabap conf during registration
- B. The path was stored to the environment of user <sid>adm during registration
- C. The path was stored in file host_profile during registration
- D. The path is taken from the URL entered in the browser to start SUM
Answer: A
NEW QUESTION # 57
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. TABIM_SHADOW_*
- B. PARMVNT_UPG
- C. PARDIST_SHD
- D. TABIMJJPG
Answer: D
NEW QUESTION # 58
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. SAP ECC system from SAP ERP 6.0 EHP 8
- B. SAP Solution Manager 7.2
- C. SAP S/4HANA Server 1809 and above
- D. Standalone AS ABAP with SAP_BASIS 752 and above
Answer: C,D
NEW QUESTION # 59
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Modification adjustment (SPDD)
- B. Activation of dictionary objects (ACT_UPG)
- C. Conversion of application tables (PARCONVJJPG)
- D. Switch to new repository (EU_SWITCH)
Answer: A,B
NEW QUESTION # 60
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for target release, Linux, SAP HANA
- B. Kernel for target release, Windows, SAP MaxDB
- C. Kernel for source release, Windows, SAP MaxDB
- D. Kernel for target release, Windows, SAP HANA
Answer: C,D
NEW QUESTION # 61
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Downtime Optimized DMO (DoDMO)
- B. Near-Zero Downtime Maintenance (nZDM)
- C. Downtime Optimized Data Conversion (DoC)
- D. Near-Zero Downtime Technology (NZDT)
Answer: D
NEW QUESTION # 62
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- C. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
Answer: C
NEW QUESTION # 63
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Uninstall industry extensions not supported by SAP S/4HANA
- B. Uninstall Fiori apps not released for SAP_UI 7.50
- C. Delete client 066 (Early Watch Client)
- D. Install add-on SAP Gateway 7.50
Answer: B,C
NEW QUESTION # 64
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
- A. The SAP support packages that will be bound to the conversion
- B. The SAP support packages in the download directory that are newer than the selected support package stack
- C. The SAP support packages of the support package stack, calculated by the maintenance planner
- D. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
Answer: B
NEW QUESTION # 65
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
- A. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- B. The source system is non-Unicode and the target database is a scale-out system.
- C. SAP HANA Landscape Reorganization required a manual step to edit a file.
- D. Network capacity between exporting and importing R3load processes must be.
- E. The target database size increases temporarily because of the Shadow Repository.
Answer: A,C
NEW QUESTION # 66
......
Full E-S4HCON2023 Practice Test and 78 unique questions with explanations waiting just for you, get it now: https://drive.google.com/open?id=1dBmSu-nGEsgkJkokiZmyKtSFWz2BK0IW
Accurate & Verified Answers As Seen in the Real Exam here: https://www.passsureexam.com/E-S4HCON2023-pass4sure-exam-dumps.html